JALAN SALAK BARAT VII KOTA MADIUN
|
|||||
KODE
|
URAIAN PEKERJAAN
|
JML HRG
|
|||
A
|
PEKERJAAN PERSIAPAN
|
Rp.
|
3.250.000.
|
||
B
|
PEKERJAAN BETON
|
Rp.
|
36.808.650.
|
||
C
|
PEKERJAAN PASANGAN
|
Rp.
|
21.631.500.
|
||
D
|
PEKERJAAN ATAP
|
Rp.
|
73.244.000.
|
||
E
|
PEKERJAAN PLESTERAN
|
Rp.
|
13.886.160.
|
||
F
|
PEKERJAAN KUSEN PINTU & JENDELA
|
Rp.
|
36.870.000.
|
||
G
|
PEKERJAAN PENGECATAN
|
Rp.
|
14.924.004.
|
||
H
|
PEKERJAAN LANTAI KERAMIK
|
Rp.
|
15.515.000.
|
||
I
|
PEKERJAAN ELEKTRIKAL
|
Rp.
|
5.166.000.
|
||
J
|
PEKERJAAN SANITAIR
|
Rp.
|
1.832.500.
|
||
TOTAL ANGGARAN BIAYA
PEMBANGUNAN GEDUNG LANTAI 3
|
Rp.
|
223.130.000.
|
|||
TERBILANG : DUA
RATUS DUA PULUH TIGA JUTA SERATUS TIGA PULUH RIBU RUPIAH
|
|||||
RENCANA ANGGARAN BIAYA
|
|||||
PEMBANGUNAN GEDUNG LANTAI 3 UMUL QUR'AN
|
|||||
JALAN SALAK BARAT VII KOTA MADIUN
|
|||||
NO.
|
URAIAN PEKERJAAN
|
SAT
|
VOL
|
HRG SAT
|
JML HRG
|
Rp.
|
Rp.
|
||||
A
|
PEKERJAAN
PERSIAPAN
|
||||
1
|
BONGKAR ATAP ATAS TANGGA EXISTING
|
M2
|
15.
|
10.000.
|
150.000.
|
2
|
BONGKAR ATAP ATAS TEMPAT CUCI
|
M1
|
10.
|
10.000.
|
100.000.
|
3
|
MOBILISASI MATERIAL KELANTAI 3
|
LANTAI
|
2.
|
1.500.000.
|
3.000.000.
|
Rp.
|
3.250.000.
|
||||
B
|
PEKERJAAN
BETON
|
||||
1
|
KOLOM PRAKTIS 15/15
|
M3
|
2,82
|
3.500.000.
|
9.875.250.
|
2
|
BALOK RING (15/20)
|
M3
|
3,13
|
3.700.000.
|
11.588.400.
|
3
|
BALOK LATEI & RING GEWEL 15/15
|
M3
|
2,23
|
3.600.000.
|
8.019.000.
|
4
|
PENGECORAN PLAT TANDON TB 12 CM
|
M3
|
0,78
|
3.700.000.
|
2.886.000.
|
5
|
PENGECORAN PLAT KANOPI 10 CM
|
M3
|
1.
|
3.600.000.
|
3.600.000.
|
6
|
PENGECORAN PLAT TALANG BETON TB 8 CM
|
M3
|
0,24
|
3.500.000.
|
840.000.
|
Rp.
|
36.808.650.
|
||||
C
|
PEKERJAAN
PASANGAN
|
||||
1
|
PASANGAN BATA LANTAI 2
|
M2
|
228,42
|
75.000.
|
17.131.500.
|
2
|
PASANGAN BATA GEWEL
|
M2
|
60.
|
75.000.
|
4.500.000.
|
Rp.
|
21.631.500.
|
||||
D
|
PEKERJAAN
ATAP
|
||||
1
|
RANGKA ATAP BAJA RINGAN
|
M2
|
184,25
|
130.000.
|
23.952.500.
|
2
|
PENUTUP ATAP GENTENG METAL
|
M2
|
184,25
|
170.000.
|
31.322.500.
|
3
|
PEK. LISPLANK WOODPLANK
|
M1
|
53.
|
50.000.
|
2.650.000.
|
4
|
PEKERJAAN PLAFOND DAN RANGKA
METALFURRING
|
M2
|
135.
|
105.000.
|
14.175.000.
|
5
|
PEKERJAAN LIST PLAFOND
|
M1
|
143.
|
8.000.
|
1.144.000.
|
Rp.
|
73.244.000.
|
||||
E
|
PEKERJAAN
PLESTERAN
|
||||
1
|
PEKERJAAN PLESTERAN DINDING
|
M2
|
516,84
|
24.000.
|
12.404.160.
|
2
|
PEKERJAAN BENANGAN & TALI AIR
|
M1
|
247.
|
6.000.
|
1.482.000.
|
Rp.
|
13.886.160.
|
||||
F
|
PEKERJAAN
KUSEN PINTU & JENDELA
|
||||
1
|
KUSEN KAYU PINTU ( P1 )
|
UNIT
|
1.
|
600.000.
|
600.000.
|
2
|
KUSEN KAYU PINTU ( P2 )
|
UNIT
|
5.
|
500.000.
|
2.500.000.
|
3
|
PINTU KAMAR MANDI PVC (P3)
|
UNIT
|
2.
|
300.000.
|
600.000.
|
4
|
KUSEN JENDELA (J1)
|
UNIT
|
3.
|
550.000.
|
1.650.000.
|
5
|
KUSEN JENDELA (J2)
|
UNIT
|
3.
|
450.000.
|
1.350.000.
|
6
|
KUSEN JENDELA (J3)
|
UNIT
|
22.
|
350.000.
|
7.700.000.
|
7
|
DAUN PINTU PANEL (P1)
|
UNIT
|
2.
|
800.000.
|
1.600.000.
|
8
|
DAUN PINTU PANEL (P2)
|
UNIT
|
5.
|
800.000.
|
4.000.000.
|
9
|
DAUN JENDELA + KACA BENING 5mm
(J1)
|
UNIT
|
3.
|
400.000.
|
1.200.000.
|
10
|
DAUN JENDELA + KACA BENING 5mm
(J2)
|
UNIT
|
3.
|
400.000.
|
1.200.000.
|
11
|
DAUN JENDELA + KACA BENING 5mm
(J3)
|
UNIT
|
22.
|
400.000.
|
8.800.000.
|
12
|
PEKERJAAN SEKAT PARTISI
|
M2
|
37,80
|
150.000.
|
5.670.000.
|
Rp.
|
36.870.000.
|
||||
G
|
PEKERJAAN
PENGECATAN
|
||||
1
|
PENGECATAN DINDING
|
M2
|
568,52
|
21.000.
|
11.939.004.
|
2
|
WATERPROOFING TALANG & PLAT
ATAP
|
M2
|
6.
|
25.000.
|
150.000.
|
3
|
PENGECATAN PALFOND
|
M2
|
135.
|
21.000.
|
2.835.000.
|
Rp.
|
14.924.004.
|
||||
H
|
PEKERJAAN
LANTAI KERAMIK
|
||||
1
|
KERAMIK LANTAI RUANGAN (Uk.40 x 40
cm) LANTAI 3
|
M2
|
125.
|
105.000.
|
13.125.000.
|
2
|
KERAMIK KAMAR MANDI ( Uk. 20 x 20
)
|
M2
|
14.
|
85.000.
|
1.190.000.
|
3
|
KERAMIK DINDING KM ( Uk. 20 x 25
cm )
|
M2
|
12.
|
100.000.
|
1.200.000.
|
Rp.
|
15.515.000.
|
||||
I
|
PEKERJAAN
ELEKTRIKAL
|
||||
1
|
PENYAMBUNGAN JALUR (LAMPU ,STOP
KONTAK)
|
TITK
|
32.
|
105.000.
|
3.360.000.
|
2
|
LAMPU TL 20 WATT
|
BH
|
20.
|
63.000.
|
1.260.000.
|
3
|
LAMPU SL 15 WATT
|
BH
|
3.
|
32.000.
|
96.000.
|
4
|
SAKLAR TUNGGAL
|
BH
|
6.
|
25.000.
|
150.000.
|
5
|
SAKLAR GANDA
|
BH
|
3.
|
25.000.
|
75.000.
|
6
|
STOP KONTAK
|
BH
|
9.
|
25.000.
|
225.000.
|
Rp.
|
5.166.000.
|
||||
J
|
PEKERJAAN
SANITAIR
|
||||
1
|
KLOSET JONGKOK
|
UNIT
|
2.
|
245.000.
|
490.000.
|
2
|
KRAN AIR
|
UNIT
|
4.
|
20.000.
|
80.000.
|
3
|
PIPA 3" ( LIMBAH KOTOR)
|
M1
|
10.
|
65.000.
|
650.000.
|
4
|
PIPA 2" (AIR KOTOR)
|
M1
|
11.
|
35.000.
|
385.000.
|
5
|
PIPA 3/4" (AIR BERSIH)
|
M1
|
13.
|
17.500.
|
227.500.
|
Rp.
|
1.832.500.
|